Projects

Our engineering and management team brings over 25 years of extensive experience in the contracting and industrial sectors across various disciplines in the Kingdom of Saudi Arabia. Throughout their careers, our team has contributed to the management and execution of numerous distinguished projects, some of which are highlighted below.

Galvanizing Plant Project

CLIENT:

Al Babtain Power & Telecommunications Co.

CONSULTANT:

Al Shaheen Engineering Consultants Office

DURATION:

6 months - 2005

LOCATION:

Second Industrial City – Riyadh.

Construction of a 8,500 m² Hot-Dip Galvanizing plant comprising eight processing and galvanizing tanks, in addition to acid storage tanks. The project scope included all civil works, steel building erection, and complete electrical and mechanical works, with a total project value of SAR 6,750,000

POWER TRANSMISSION TOWERS MANUFACTURING PLANT Project

CLIENT:

Al Babtain Power & Telecommunications Co.

CONSULTANT:

Al Shaheen Engineering Consultants Office

DURATION:

5 months - 2005

LOCATION:

Second Industrial City – Riyadh

Construction of a 22,000 m² high-voltage transmission tower manufacturing plant featuring integrated production lines, including plate cutting and bending machines, punching and welding equipment, together with all supporting manufacturing systems and utilities. The project scope included all civil works, including specialized machine foundations, steel building erection, and complete electrical and mechanical works, with a total project value of SAR 13,500,000.

LIGHTING POLES MANUFACTURING PLANT PROJECT

CLIENT:

Al Babtain Power & Telecommunications Co.

CONSULTANT:

Al Shaheen Engineering Consultants Office

DURATION:

6 months - 2006

LOCATION:

Second Industrial City – Riyadh

Construction of an 8,000 m² lighting pole manufacturing plant featuring integrated production lines, including plate cutting and bending machines, as well as laser welding equipment. The project scope included all civil works, including machine foundations, steel building erection, and complete electrical and mechanical works. The scope also covered external site development works, including 6,000 m² of storage yards equipped with 25-ton gantry cranes, together with their associated electrical works. In addition, the project included the construction of water service and fire protection tanks, roads and paving works, site landscaping, parking areas, electrical and transformer rooms, and a security building, with a total project value of SAR 8,250,000.

ELECTRONIC COMPONENTS WAREHOUSE & CENTRAL PARKING FACILITIES PROJECT

CLIENT:

Advanced Electronics Company (SAMI)

CONSULTANT:

Al Jazeera Engineering Consultancy Office

DURATION:

10 months - 2007

LOCATION:

Private Aviation Area – Riyadh

Construction of the Electronic Chips Warehouse with a built-up area of 6,500 m², with the construction of the central parking facility covering approximately 12,500 m². The project scope included all civil works, the supply and erection of steel buildings for both the warehouse and the central parking facility, architectural finishing works, complete electrical and mechanical works, as well as roads, paving, and external site development works, with a total project value of SAR 8,500,000.

SECOND MANUFACTURING PLANT FOR SAUDI VITRIFIED CLAY PIPE COMPANY Project

CLIENT:

Saudi Vitrified Clay Pipes

CONSULTANT:

Talal Al Taher

DURATION:

20 months - 2009

LOCATION:

Second Industrial City – Riyadh

Construction of the Second Factory for the Saudi Vitrified Clay Pipes Company on a total site area of 65,000 m², comprising the main production building, administration building, chemical storage warehouse, service buildings and facilities, as well as raw material and finished product storage yards. The project scope included all civil works, steel building erection, machine and kiln foundations, material conveyor tunnels, architectural finishing works, complete electrical and mechanical works, and fire protection systems, with a total project value of SAR 35,350,000.

AL-BABTAIN EMPLOYEES RESIDENTIAL COMPLEX Project

CLIENT:

Al-Babtain Energy & Telecommunication

CONSULTANT:

Sarouh Engineering Consultants

DURATION :

18 months - 2011

LOCATION:

Al-Misfalah District- Riyadh

Construction of an Employees Residential Complex comprising 12 independent residential buildings with a total built-up area of 18,000 m², together with service buildings and facilities, including water storage tanks, fire protection tanks, and electrical rooms. The project scope included all civil works, architectural finishing works, and complete electrical and mechanical works, with a total project value of SAR 10,250,000.

Autocompo Metal Stainless Steel Pipes Factory Project

CLIENT:

Al-Hugailan Holding Company

CONSULTANT:

Al-Shahin Engineering Consultants

DURATION:

10 months - 2010

LOCATION:

Second Industrial City – Riyadh

Construction of a 7,000 m² stainless steel pipe manufacturing plant, together with service buildings and facilities, as well as raw material and finished product storage yards. The project scope included all civil works, steel building erection, machine foundations, material conveyor tunnels, architectural finishing works, complete electrical and mechanical works, fire protection systems, and the installation of ventilation systems and cooling lines serving the production lines, with a total project value of SAR 10,650,000.

SECOND MANUFACTURING PLANT FOR MESC CABLES Project

CLIENT:

Middle East Specialized Cables Company (MESC)

CONSULTANT:

Al-Shahin Engineering Consultants

DURATION :

10 Months - 2012

LOCATION:

Second Industrial City – Riyadh

Construction of the Second Factory for MESC Cables, on a total site area of 13,000 m². The project comprised a 6,000 m² factory building, a 21-meter-high production tower, together with all service buildings and facilities, including water storage and fire protection tanks, electrical rooms, a security building, boundary walls, and storage yards. The project scope included all civil works, steel building erection, and complete electrical and mechanical works, with a total project value of SAR 10,550,000.

CENTRAL ARCHIVE BUILDING SAUDI BRITISH BANK

CLIENT:

Saudi British Bank

CONSULTANT:

United Engineering Consultants

DURATION :

9 Months - 2014

LOCATION :

Al-Sulai District – Riyadh

Construction of the Central Archive Building on a total site area of 8,000 m², comprising a 5,000 m² archive building together with all service buildings and facilities, including water storage and fire protection tanks, electrical rooms, a security building, and boundary walls. The project scope included all civil works, steel building erection, complete electrical & mechanical works, and specialized fire protection systems, with a total project value of SAR 10,730,000.

LOW VOLTAGE METAL FACTORY EXPANSION

CLIENT:

Alfanar Electrical Systems

CONSULTANT:

Dar Al-Handasah, Engineering Consultants

DURATION :

9 months - 2006

LOCATION :

Alfanar Industrial City, Riyadh

Construction of the Low Voltage Metal Factory Expansion on a total area of 4,500 m². The project scope included all civil works, steel building erection, and complete electrical and mechanical works, with a total project value of SAR 3,850,000.

TRANSFORMER PAINT MANUFACTURING PLANT

CLIENT:

Alfanar Electrical Systems

CONSULTANT:

Dar Al-Handasah, Engineering Consultants

DURATION :

9 months - 2006

LOCATION :

Alfanar Industrial City, Riyadh

Construction of the Transformer Paint Manufacturing Plant on a total area of 3,900 m². The project scope included all civil works, steel building erection, and complete electrical and mechanical works, with a total project value of SAR 2,635,000.

UTILITY BUILDINGS & SUPPORT FACILITIES

CLIENT:

Alfanar Electrical Systems

CONSULTANT:

Dar Al-Handasah, Engineering Consultants

DURATION :

9 months - 2006

LOCATION :

Alfanar Industrial City, Riyadh

Execution of various infrastructure and support facility projects within the industrial complex, including oil storage tanks, a 5,500 m³ main fire water tank, UPS (Uninterruptible Power Supply) facilities, the main truck entrance complete with a truck weighbridge, a 2,500 m² canopy with a height of 12 m, and a materials laboratory, including all electrical and mechanical works, with a total project value of SAR 4,350,000.

CONCRETE BOX CULVERT MANUFACTURING PLANT

CLIENT:

Al Bilad Concrete Pipes Company

CONSULTANT:

MAC Engineering Consultants

DURATION :

8 months - 2017

LOCATION :

the Second Industrial City, Riyadh

Construction of the Concrete Box Culvert Manufacturing Plant for Albilad Company, with a total built-up area of 4,500 m², together with a 5,500 m² raw material storage yard. The project scope included all civil works, steel building erection, complete electrical and mechanical works, civil works for the raw material storage area, and the fabrication and installation of its steel canopies, with a total project value of SAR 6,500,000.

AVIATION SUPPORT SERVICES FACILITY

CLIENT:

Al Bilad National Group

CONSULTANT:

Talal Al-Taher Engineering Consultants

DURATION :

14 months - 2017

LOCATION :

the Private Aviation Zone - Riyadh

Construction of the Aviation Services Building Project on a total site area of 15,500 m², comprising a 10,000 m² main building, a 3,000 m² administration building, together with all service buildings and facilities, including water storage and fire protection tanks, electrical rooms, a security building, and boundary walls. The project scope included all civil works, steel building erection, complete electrical and mechanical works, fire protection systems, and the installation of 20 ton overhead cranes, with a total project value of SAR 18,500,000.

NORTH INDUSTRIAL

CLIENT:

Alinma Investment Fund

CONSULTANT:

Al Manaber & Al Emad Al Arabi Engineering Consultants

DURATION :

24 Months - 2021

LOCATION :

Al Qirawan District-Riyadh

Construction works, steel building erection, and external site development for 12 buildings with a total built-up area of 60,000 m². The project scope included the construction of all service buildings and facilities, including water storage tanks, a water treatment plant, and electrical rooms, with a total project value of SAR 43,000,000.

INTERLOCK MANUFACTURING PLANT

CLIENT:

Al Sarif Cement Products Company

CONSULTANT:

New Corner Engineering Consultants

DURATION :

7 Months - 2021

LOCATION :

the Second Industrial City -Riyadh

Construction of the Interlock Manufacturing Plant for Al Sarif Company, with a total built-up area of 3,500 m², together with a 2,500 m² treatment plant comprising treatment basins, storage tanks, and silos. The project scope included all civil works, fabrication and erection of steel buildings and steel platforms, and complete electrical and mechanical works, with a total project value of SAR 4,750,000.

AL JAZIRAH CEMENT PRODUCTS COMPANY FACTORY

CLIENT:

Al Jazeera Paints Company

CONSULTANT:

Al-Shahin Engineering Consultants

DURATION :

12 months - 2022

LOCATION :

Sudair Industrial City -Riyadh

Construction of a Cement Products Manufacturing Plant with a total built-up area of 4,350 m², comprising a 44meter-high production tower consisting of multiple levels designed to accommodate the production lines and equipment layout. The project also included a 24-meter-high silo platform supporting 28 silos with capacities ranging from 20 m³ to 150 m³, founded on foundations extending to a depth of 9.0 m. In addition, the project comprised a 5,000 m² production hall and a ground-level silo storage area. The project scope included all civil works, steel production tower erection, and complete electrical and mechanical works, with a total project value of SAR 7,650,000.

Saudi Auto Parts Center Factory

CLIENT:

Al Khorayef Holding Group

CONSULTANT:

Al Manaber Engineering Consultants & MAZ Engineering Consultants

DURATION :

12 months - 2011

LOCATION :

Al Bawabah Industrial City -Riyadh

Construction of the Al Markaz Al Aali Factory, on a total site area of 10,000 m². The project comprised two industrial buildings, each with an area of 3,000 m², in addition to a 2,000 m² administration building, together with all service buildings and facilities, including water storage and fire protection tanks, electrical rooms, a security building, and boundary walls. The project scope included all civil works, steel building erection, and complete electrical and mechanical works, with a total project value of SAR 10,350,000.

PEUGEOT SERVICE CENTER AND SHOWROOM

CLIENT:

Almajdouie Motors

CONSULTANT:

AlRoukn Engineering Consultants

DURATION :

6 Months / 2021

LOCATION :

North Industrial -Riyadh

Execution of integrated architectural finishing works, complete electrical and mechanical works, fire alarm and fire protection systems, CCTV systems, and all specialized works for the Peugeot Service Center and Showroom, including the reception area, with a total built-up area of 5000m². The project scope included the installation of all service center facilities and equipment, including vehicle lifts, paint booths, the spare parts area, and the Engine Overhaul Room, with a total project value of SAR 3,450,000.

KIA SERVICE CENTER

CLIENT:

Al Jabr Automotive Company

CONSULTANT:

Sorouh Al Emarah Engineering Consultants

DURATION :

4 Months / 2022

LOCATION :

North Industrial -Riyadh

Execution of integrated architectural finishing works, complete electrical and mechanical works, fire alarm and fire protection systems, CCTV systems, and all specialized works for the Kia Service Center. The project scope included the installation of all service center facilities and equipment, including vehicle lifts, paint booths, the spare parts area, and the Overhaul Room, with a total project value of SAR 2,350,000.

OVERVIEW OF STEEL STRUCTURE ERECTION PROJECTS

Our engineering team has also contributed to the execution of numerous steel structure erection projects for leading manufacturers across the Kingdom of Saudi Arabia, following a professional execution methodology that ensures the highest standards of quality, safety, and efficiency. The scope of work included the preparation of Method Statements, steel erection and testing in full compliance with the manufacturer's drawings and specifications, and adherence to engineering best practices. The following are selected steel structure erection projects successfully delivered by our engineering team in collaboration with some of the Kingdom's leading contracting companies.

AZMEEL CONTRACTING COMPANY

Steel structure erection for the Saudi Arabian National Guard (SANG) Indoor Shooting Range, with a total area of 2,200 m².

ARABIAN CONSTRUCTION COMPANY

Steel structure erection for the high-voltage cable support system at SEC Substation .

AL MAJAL AL ARABI COMPANY

Steel building erection works at Najran University, with a total area of 7,500 m²

SARAYA AL BENAA CONTRACTING COMPANY

Erection of temporary steel buildings for the Embassy of Canada in the Diplomatic Quarter, Riyadh, with a total area of 8,350 m².

JOANNOU & PARASKEVAIDES

Steel structure erection works for the Information Technology and Communications Complex (ITCC) project, developed by Riyadh Investment Company.

AL GHURAIR CONTRACTING COMPANY

Steel canopy erection for the General Organization for Social Insurance (GOSI) building

POLGO CONTRACTING COMPANY

Steel structure erection for the Special Security Brigade Building at the Saudi Arabian National Guard in Khashm Al Aan, Riyadh, with a total area of 23,107 m².

STEEL STRUCTURE ERECTION PROJECTS